You can use the add split line tool to add linear edges and to split the existing face of a roof or structural floor into smaller sub regions.
How to separate 2 roofs.
Click modify floors tab shape editing panel add split line.
Generate a roof on the top of the second floor as well as over the single level garage.
Sheathing blocking is added along the valley and the sheathing pieced in for both roof planes.
To transition the eaves the horizontal fascia extends to the last rafter tail and a vertical return finishes the transition.
Select a vertex edge face or point anywhere on the structural floor to start the split line.
Draw a diagonal line between 9 feet the run of the main roof on the tongue of the square and 7 feet 6 inches the secondary roof run on the blade.
6118 recommended preferences.
Once you get one end separated with the putty knife they usually will come apart.
Position the flashing between the two roof pitches.
On the view control bar for visual style select shaded.
In this video we show you how to remove separate an mpk vision vent which we thought was called a heki roof light for cleaning.
At the low end of the valley the subfascias of the two roofs are mitered with a block filling in the roof framing.
In a hip roof with equal pitches the unit run of a hip or valley rafter is 17 inches for every 12 inches of run in the main roof.
Ake a putty knife and work the blade between the shingles at the sealant tabs where they are stuck.
6117 help resources.
6116 user interface.
Slide the right edge of the flashing under the highest roof pitch.
Place the 2 by 4 inch piece of lumber along the center of the flashing.
If necessary use the viewcube to spin the design to facilitate selecting the wall or roof edges.
Unit run of the hip.
Select the floor to modify.
6120 file management.
This gives the angle of the hip rafter.